Pardon Our Noise: Deliveries and Installation of Furniture July 29-30

construction stripe

Delivery of furniture will occur through the 1st floor east door and elevator lobby Mon.-Tues. July 29-30. One elevator in the main elevator bank will be dedicated to moving furniture to upper floors. The new furniture will be placed in the first floor Main Library study area near the south side windows, the 2nd floor group study area along the north side glass wall, and some 3rd and 4th floor study areas.

Students may wish to relocate to the Quiet Study Room in the Research Commons on the 1st floor or the study tables along the west side of the book stacks on floors 3 and 4.