Wednesday/ Power Failure/ Annex 1

The library server in Annex 1 crashed this morning. All workstations, VTS, and some power were inaccessible. Campus electricians arrived. They said a shared electrical system (bathrooms) with the Library Server caused the shut-down. Note: bathroom repair work was being done this morning.

Everything is restored, but electricians didn’t advise sharing the power circuit between server and bathrooms.

tki

Leave a comment